{"id":1029,"date":"2010-04-11T14:53:01","date_gmt":"2010-04-11T20:53:01","guid":{"rendered":"http:\/\/www.boulderblueline.org\/?p=1029"},"modified":"2010-05-22T13:21:14","modified_gmt":"2010-05-22T19:21:14","slug":"us-36-phase-one-improvements","status":"publish","type":"post","link":"https:\/\/www.boulderblueline.org\/?p=1029","title":{"rendered":"US 36 Phase One Improvements"},"content":{"rendered":"<div id=\"attachment_1032\" style=\"width: 805px\" class=\"wp-caption aligncenter\"><strong><a href=\"http:\/\/www.boulderblueline.org\/wp-content\/uploads\/2010\/04\/US36.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1032\" class=\"size-full wp-image-1032\" title=\"US36\" src=\"http:\/\/www.boulderblueline.org\/wp-content\/uploads\/2010\/04\/US36.jpg\" alt=\"\" width=\"795\" height=\"434\" srcset=\"https:\/\/www.boulderblueline.org\/wp-content\/uploads\/2010\/04\/US36.jpg 795w, https:\/\/www.boulderblueline.org\/wp-content\/uploads\/2010\/04\/US36-300x163.jpg 300w, https:\/\/www.boulderblueline.org\/wp-content\/uploads\/2010\/04\/US36-400x218.jpg 400w\" sizes=\"auto, (max-width: 795px) 100vw, 795px\" \/><\/a><\/strong><p id=\"caption-attachment-1032\" class=\"wp-caption-text\">photo courtesy wikimedia.org<\/p><\/div>\n<p>City of Boulder   Guidelines for the Implementation of US 36 Phase One Improvements was the topic of discussion at the April 6, 2010 City Council meeting.<\/p>\n<p>A Record of Decision (ROD) was signed in December 2009 for the first phase of improvements to US 36 between Denver and Boulder. The ROD on the Final Environmental Impact Statement (FEIS) identifies a \u201cpreferred alternative\u201d set of improvements. As stated in the Executive Summary for this agenda item, \u201cPhase One of the preferred alternative improvements is a strong multimodal package that includes a managed lane [for use by Bus Rapid Transit (BRT), high-occupancy vehicles and toll-paying vehicles], key interchange improvements and a bikeway between Boulder and Denver<em>.<\/em>\u201d And, it also states, \u201cThe planned multimodal expansion of US 36 will be one of the single largest capital improvement projects to take place near the city in recent years.\u201d<\/p>\n<p><em> <\/em><\/p>\n<p>Director of Public Works Tracy Winfree presented the draft guidelines explaining that they were in response to a request by Council at the January 2010 study session on regional transportation. This document lays out policy guidelines to inform and guide involvement in the implementation of improvements to the US 36 corridor between Boulder and Denver.<em> <\/em>Funding for the project is now top priority, while various design and impact issues also need on-going attention. Guiding principles will be the environment and resolving issues that were not resolved satisfactorily in past. Of particular concern will be the monitoring of progress and advocating for wetland mitigation and wildlife protection under both Federal and local regulations.<\/p>\n<p>City Council voted unanimously (Council Member Cowles was absent) to approve the motion made by Council Member Gray and seconded by Council Member Morzel to approve the City of Boulder Guidelines for the Implementation of US 36 Phase One Improvements as amended by Council on April 6, 2010, but with direction to strengthen the wording in the guidelines.<\/p>\n<p>Some Council Members expressed concern that the wording in the guidelines was \u201cwimpy.\u201d \u00a0Their reasoning was that, because the guidelines are a public document, they need to be clearer about how serious the city is about critical issues.\u00a0 With stronger language in the guidelines, Boulder\u2019s resolve would be apparent to other negotiating parties and Boulder\u2019s representatives in negotiations would have less wiggle room.\u00a0 The staff memo and draft guidelines are available on the city\u2019s <a href=\"http:\/\/www.bouldercolorado.gov\/files\/Clerk\/Agendas\/2010\/April_6\/6A.pdf\">website<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>City of Boulder Guidelines for the Implementation of US 36 Phase One Improvements was the topic of discussion at the April 6, 2010 City Council meeting. A Record of Decision [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":1032,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[128],"tags":[11,25,98],"class_list":["post-1029","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-dot-gov","tag-city-council","tag-transportation","tag-us-36"],"_links":{"self":[{"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=\/wp\/v2\/posts\/1029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1029"}],"version-history":[{"count":10,"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=\/wp\/v2\/posts\/1029\/revisions"}],"predecessor-version":[{"id":1634,"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=\/wp\/v2\/posts\/1029\/revisions\/1634"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=\/wp\/v2\/media\/1032"}],"wp:attachment":[{"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.boulderblueline.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}